
Quality Pre-Owned Lease Equipment

Shinn Systems currently has three machines available for
rent.
Shinn Systems SC-2 mounted on a CAT 322L
- CAT 322L SN 9RL01240
- Hours on excavator…..4850
- Shinn Systems SN 24032LCASC2
- SC-2 Hours………3350
-
- CAT 322L
-
·
Radiator recently rodded and flushed
(5/2002)
-
·
Rebuilt drive motors (5/2002)
-
·
Rebuilt swing gearbox (7/2001)
-
·
New rails (5/2001)
-
·
Oil/filter change every 250 hours
-
·
Air Conditioning
-
·
No dents in excavator trim panels
-
-
- Shinn Systems SC-2 equipped with the
following…
-
·
CAT 3306 engine rated 315 HP @ 2200
RPM
-
·
Engine auto shutdown
protection-high water temp, low oil pressure, overspeed
-
·
CAT 16.5 CFM Air compressor with
controls
-
·
Heavy duty Korfund engine mounts
-
·
High ambient radiator with heavy
duty braces
-
·
Denison hydraulic pump (104 GPM @
5000 PSI, torque limited to 268 HP)
-
·
Funk pump drive
-
·
External charge filtration
-
·
55 gallon hydraulic reservoir with
sight gage, low level warning, removable top and baffles
-
·
Hayden oil cooler with “Smart Valve
Technology” and swirl augmentation, hinged for easy access for cleaning
-
·
Hydraulic oil heater system-This
system is powered off of the auxiliary engine and uses a pump and a bypass
valve to heat the oil in the hydraulic tank. This system is capable of
heating the oil from a temperature of 32F to 75F in less than ten minutes.
-
·
Dual 5 gallon air reservoirs with
drains and gage.
-
·
80 gallon fuel tank with low level
warning, drains, vented cap, removable top
-
·
Gates heavy duty hose rated to 5000
PSI working pressure/20,000 PSI burst
-
·
Equipped with air bleed manifold
system. During hose changes, this bleed valve purges air automatically from
the high pressure loop, preventing cavitation damage to pump and motor.
-
·
Fall on protection cage constructed
of 4 X 4 X 3/8” tubing with hinged 1 X 1/8” front window grating.
-
·
Lexan front windows
-
- Cutter Head
-
·
SC-2 cutter head 24” diameter, 36”
long
-
·
40 index-able teeth and holders
-
·
Computer balanced before delivery to
your facility
-
·
Gates Poly Chain GT-2 Belt Drive
System
-
·
1” lower covers
-
·
1” shield construction
-
·
¼ “ hydraulic motor and upper belt
covers
-
·
Denison hydraulic motor
-
·
Heavy duty power coupling
-
- We will perform a 500 hour inspection on this
machine before delivery. This includes…
-
-
·
Hydraulic system analysis using
digital data acquisition equipment
-
·
Spectral Oil Analysis
-
·
Balancing of cutter head
-
·
Inspection of cutter head and
auxiliary engine and systems
||
home||
company
profile ||
models ||
lease equipment ||
|| used equipment ||
contractors||
news ||